The proposed funding would be split across three projects in two locations:
In Sherman, Texas, the construction of two new, large-scale 300-mm fabrication facilities that are expected to produce 65nm – 130nm essential chips.
In Lehi, Utah construction of a new, large-scale 300-mm fabrication facility to produce 28nm – 65nm analogue and embedded processing chips.